Fix the vanity before the plumber and electrician chase the wall. Choose the basin, tap and cabinet first, draw the vanity elevation, then derive every point from it: counter height, waste outlet and trap space, angle valves above the trap and clear of drawers, tap position, mirror light and socket. Pressure-test and photograph concealed lines before tiling, and put bathroom circuits on residual-current protection.
WoodAge is a factory-direct modular kitchen, wardrobe and custom furniture manufacturer operating since 2003 and based at 16 SCO, Saraswati Vihar, Chakkarpur, Gurugram 122002. A vanity is a piece of joinery bolted onto plumbing that was fixed weeks earlier, often by a different team. When the points are placed before anyone has drawn the cabinet, the usual results are a trap that hits the drawer, angle valves behind a fixed panel and a mirror light switch in the wrong place, all visible only after the tiles are on.
This page owns the pre-tiling point schedule for a vanity wall, the same method the kitchen plumbing points guide uses for kitchens. Vanity materials, designs, sizes and costs are covered in the custom bathroom vanity guide, and sanitaryware brands in Jaquar vs Kohler vs Hindware vs Cera.
Quick answer: the order of decisions
| Step | Decide | Because it fixes |
|---|---|---|
| 1 | Basin type and model | Rim height, waste outlet position and tap type |
| 2 | Tap type and model: deck-mounted or wall-mounted | Supply point height and position |
| 3 | Vanity cabinet: wall-hung or floor-standing, drawers or doors | Where the trap and valves can sit |
| 4 | Counter height from the finished floor | Every other height on the wall |
| 5 | Mirror, mirror light and any sensor or demister | Power point behind or beside the mirror |
| 6 | Geyser position and supply route | Hot-water line and its switch |
| 7 | Sockets for dryer, shaver or chargers | Position away from water, with protection |
Only after steps 1 to 7 should the wall be chased and the points fixed.
The point schedule: derive each point, do not guess it
| Point | Derive it from | Rule of thumb to check against |
|---|---|---|
| Counter height | The users and the basin type | Indian fixture references commonly plan about 800 to 850 mm from the finished floor to the basin rim |
| Basin rim | Counter height plus the basin’s height above the counter | A tall vessel basin needs a lower counter |
| Waste outlet (wall or floor) | Basin model and trap type | Keep it inside the cabinet’s service zone, not behind a drawer |
| Trap space | Trap type: bottle trap or P-trap | Drawers need a cut-out or a U-shape around the trap |
| Angle valves (hot and cold) | Basin supply hoses and cabinet layout | Above the trap, reachable through a door or removable panel |
| Wall-mounted tap supply | Tap datasheet: spout height and projection | The spout must reach the basin’s water area and clear the rim |
| Mirror light and sensor mirror | Mirror size and fixing height | Power point concealed behind the mirror, switch outside the splash area |
| Sockets | Appliances used at the vanity | Away from the basin and shower, protected by an RCD |
| Geyser inlet and outlet | Geyser location, often above the ceiling line | Hot-water route to the basin mixer; switch placed per the electrician’s plan |
IS 2064, the Indian code of recommendations for selecting and installing sanitary appliances, is the reference to consult for fixture heights; the 800 to 850 mm range above is a common planning figure, not a rule for every household. For a wheelchair user, India’s Harmonised Guidelines for universal accessibility describe a wall-hung basin with clear knee space beneath; follow that document rather than a standard vanity.
A cross-check, not a rule. US plumbing rough-in guides, such as this one on standard vanity water and drain heights, commonly place the drain at about 18 to 20 inches (457 to 508 mm) above the finished floor and the hot and cold supplies at about 20 to 22 inches (508 to 559 mm), roughly 4 inches (about 100 mm) either side of the drain’s centre line. Use those figures only to sanity-check a drawing; the chosen basin, trap and cabinet, measured from the finished floor, decide the actual points.
Wall-hung or floor-standing: the cabinet changes the plumbing
Wall-hung vanities keep the floor clear for mopping, which suits Indian bathrooms. They need a wall that can carry the cabinet, the stone or solid-surface top, the basin and a person leaning on the edge, so confirm the wall type and the fixing before tiling. In brick or RCC, anchors rated for the base material are used; in a drywall partition, blocking or a frame must be built into the wall.
Floor-standing vanities carry their own weight, but their base meets mop water. Raise the carcass on legs or a moisture-resistant plinth, as the vanity guide explains.
Either way, draw the trap, valves and hoses on the cabinet drawing. Check the drawer boxes in particular, because a drawer cannot share its space with a trap or a hose.
Before tiling: test, photograph and record
Once tiles are fixed, concealed pipes cannot be inspected without breaking them. Three steps protect the whole bathroom:
- Pressure-test the supply lines after they are fixed and before they are covered, and write down the result and the date.
- Photograph every concealed line with a tape measure in the frame, showing heights and distances from a corner or the finished-floor mark.
- Mark the finished-floor level on the wall before plumbing starts, so every height is measured from the same datum after tiling and screed.
Keep the photographs with the handover file. Anyone who later drills to fix a mirror, cabinet or grab rail can check where the pipes run. Pipe-leak and seepage diagnosis is covered in the seepage and waterproofing guide.
Electrical safety at the vanity
Bathrooms combine water, bare skin and metal pipework, which is why wiring codes treat them as special locations. India’s wiring code is IS 732:2019, with earthing covered by IS 3043. The international rules for bathrooms, IEC 60364-7-701, divide the room into zones around the bath or shower, limit what equipment may be placed in each, and call for residual-current protection of 30 mA or less on bathroom circuits.
For a vanity wall, that translates into five practical requests to your electrician:
- put the bathroom circuits on an RCD, and test it at handover;
- keep sockets away from the basin and shower, in positions the electrician confirms against IS 732;
- use fittings with a suitable ingress-protection rating near water;
- run the sensor-mirror or mirror-light supply to a concealed point behind the mirror, not a trailing flex;
- earth metal fittings as the electrician specifies under IS 3043.
The BIS guide to the National Building Code 2016 shows where electrical installations (Part 8) and plumbing (Part 9) are covered, for readers who want the code structure.
Common mistakes on vanity walls
| Mistake | What happens | Prevention |
|---|---|---|
| Points fixed before the basin is chosen | Waste outlet behind a drawer, tap supply at the wrong height | Choose basin and tap first |
| Angle valves hidden behind a fixed panel | No way to shut off water without dismantling | Put valves behind a door or removable panel |
| Trap ignored in drawer design | Drawers cut on site or not closing | Draw the trap on the cabinet drawing |
| Mirror light fed by a loose wire | Exposed flex near water | Concealed point behind the mirror |
| No record of concealed pipes | A later drill hole hits a pipe | Photograph lines with a tape in view |
| No finished-floor datum | Heights drift after screed and tiles | Mark the datum before plumbing |
What to check before the tiles go on
- The basin, tap and vanity models are fixed and their datasheets are on site.
- The vanity elevation shows counter height, trap, valves, drawers and mirror.
- Every point is marked from the finished-floor datum.
- Supply lines are pressure-tested and the result is written down.
- Concealed lines are photographed with measurements.
- The electrician has confirmed socket and light positions and the RCD.
- The wall’s fixing method for a wall-hung vanity is agreed.
- In a society flat, the water shut-off and drilling hours for the plumbing visit are approved by the maintenance office; the society fit-out rules guide lists what Gurugram societies usually control.
Evidence and Verification Notes
The standards named here were checked by title and edition in September 2026: IS 732:2019 for wiring, IS 3043 for earthing, IS 2064 for sanitary appliances and the BIS guide to NBC 2016. The bathroom zoning and 30 mA protection described come from the international bathroom standard, IEC 60364-7-701; confirm how your electrician applies IS 732 to your bathroom. The 800 to 850 mm counter range is a common planning figure from Indian fixture references, not a mandatory height. No prices are given here; vanity costs are covered in the vanity guide.
To get a vanity drawing that shows the trap, valves and drawers before the plumber starts, use the custom furniture manufacturer page for Delhi NCR, or see edge-sealed wet-area cabinets on a WoodAge factory visit.
Frequently Asked Questions
What height should a bathroom vanity be in India?
Indian fixture references commonly plan the basin rim at about 800 to 850 mm from the finished floor. Choose the basin first: a vessel basin sits on top of the counter, so the counter must be lower. Adjust for the people who use it most, and for a wheelchair user follow the accessibility guidelines.
Where should the drain be for a vanity?
Where the chosen basin’s waste and trap will sit inside the cabinet’s service zone, not behind a drawer. Decide wall or floor outlet and bottle trap or P-trap from the basin model, draw them on the cabinet drawing, and fix the drain point only after that drawing is agreed.
Where should angle valves go under a vanity?
Above the trap, inside the cabinet, where they can be reached through a door or a removable panel. They must not sit behind a fixed back panel or inside a drawer’s travel. You should be able to shut off hot and cold water without dismantling anything.
Can I put a socket near the bathroom mirror?
Yes, if your electrician places it away from the basin and shower in line with IS 732, uses a suitable fitting and protects the circuit with an RCD. For a sensor mirror or mirror light, run the supply to a concealed point behind the mirror rather than using a trailing flex.
Do bathroom circuits need an RCD?
The international rules for bathrooms, IEC 60364-7-701, call for residual-current protection of 30 mA or less on bathroom circuits. Ask your electrician to apply the Indian wiring code, IS 732, to your bathroom, fit an RCD on the bathroom circuits and test it at handover.
Should a vanity be wall-hung or floor-standing?
Wall-hung vanities keep the floor clear for mopping, which suits Indian bathrooms, but they need a wall and fixing that can carry the cabinet, top, basin and a person leaning on it. Floor-standing vanities need a raised or moisture-resistant base. Decide before tiling, because the wall fixing is hidden afterwards.
What should be done before tiling a bathroom?
Choose the basin, tap and vanity, draw the vanity elevation, mark every point from the finished-floor datum, pressure-test supply lines, photograph concealed pipes with a tape measure in view and confirm electrical positions and RCD protection. Tiling over unrecorded pipes turns every later repair into guesswork.
How high should the tap be above a basin?
It depends on the tap and basin. For a wall-mounted tap, use the tap’s datasheet: the spout height and projection must reach the basin’s water area and clear the rim. For a deck-mounted tap, the basin or counter sets the position. Fix the supply point only after both models are chosen.
Related Guides From WoodAge
- Custom Bathroom Vanity Guide - Materials, designs, sizes and cost.
- Kitchen Plumbing Points Before Cabinets - The same method for kitchens.
- Jaquar vs Kohler vs Hindware vs Cera - Choosing the sanitaryware.
- Seepage and Waterproofing Around Cabinets - Diagnosing concealed leaks.
- New-Possession Inspection Checklist - Checks before any work starts.
- Full-Home Interior Snag List - Final checks before payment.
Get a Factory-Direct Quote
If you are planning interiors in Gurgaon or Delhi NCR, WoodAge can help you convert the idea into a measurable BOQ: exact material grade, hardware model, finish code, timeline and warranty terms before production starts.
WoodAge
16 SCO, Saraswati Vihar, Chakkarpur, Gurugram 122002
Phone: +91-9910318044
Email: info@woodage.in
Website: woodage.in