# Kitchen + Wardrobe Package for Gurgaon Apartments: Scope, Cost, Timeline (2026)

<!-- WOODAGE_VISUAL_CAROUSEL:START -->
## Visual references for a kitchen and wardrobe package in Gurgaon

Package buyers need to see how kitchen and wardrobe scope connect across a 2BHK, 3BHK, or 4BHK plan without confusing illustrative scope with fixed pricing.

![2BHK kitchen and wardrobe package visual reference for WoodAge Gurgaon](https://www.woodage.in/images/seo-carousels/woodage-kitchen-wardrobe-package-gurgaon-2bhk-reference.webp)

Compact 2BHK package planning across one kitchen and bedroom wardrobes.

![3BHK kitchen and wardrobe package visual reference for WoodAge Gurgaon](https://www.woodage.in/images/seo-carousels/woodage-kitchen-wardrobe-package-gurgaon-3bhk-reference.webp)

3BHK package planning where multiple wardrobes share finish and hardware decisions.

![Kitchen wardrobe package BOQ visual reference for WoodAge Gurgaon apartment interiors](https://www.woodage.in/images/seo-carousels/woodage-kitchen-wardrobe-package-gurgaon-boq-bundle-reference.webp)

Bundled BOQ review helps separate kitchen, wardrobe, and accessory line items.

_These visuals are a mix of original WoodAge photos, 3D renders, and AI-assisted illustrations, included to help you picture the materials, finishes, and process described on this page._
<!-- WOODAGE_VISUAL_CAROUSEL:END -->

  
**WoodAge** offers a combined kitchen plus wardrobe package for Gurgaon apartments, manufactured at its Gurugram factory since 2003: shared site measurement, GA drawings, line-by-line BOQ, lift coordination, and a single install window. A typical 3BHK kitchen-plus-wardrobes bundle delivers in 5 to 7 weeks (estimate). Final BOQ depends on site measurement and finish selection. Call +91-9910318044.

  [Call +91-9910318044](tel:+919910318044)
  [WhatsApp](https://api.whatsapp.com/send?phone=919910318044&text=Send%20me%20a%20kitchen%20+%20wardrobe%20package%20quote)
  [Get a bundle BOQ quote](/get-quote/?source=kitchen-wardrobe-package-gurgaon)
  [Visit our factory](/factory-visit/?source=kitchen-wardrobe-package-gurgaon)

  
## Caveat: bundle pricing is project-specific

  
Every range and timeline on this page is an estimate. **Final BOQ depends on apartment size, layout, finish tier (laminate vs acrylic vs PU vs lacquer vs veneer), hardware tier (Hettich Sensys vs Blum Tandembox), accessory volume, civil readiness, society NOC turnaround, and design scope.** Numbers are illustrative WoodAge bundle ranges, not guaranteed prices.

  
## WoodAge bundle scope: what's included

  
Every WoodAge kitchen + wardrobe package for Gurgaon includes:

  

    - Single site visit + complete measurement (kitchen + every wardrobe location).

    - GA drawings for the kitchen and each wardrobe.

    - Single line-by-line bundle BOQ - every cabinet, every shutter, every hinge, every drawer system priced separately.

    - Material procurement at WoodAge volume rates (BWP IS:710 plywood, HDHMR, named laminate brand, Hettich/Häfele/Blum hardware).

    - Factory cutting in parallel - kitchen and wardrobes manufactured concurrently, not sequentially, at WoodAge's Gurugram factory.

    - Automatic edge banding on every panel (machine-bonded, monsoon-humidity tolerant).

    - Factory dispatch with society-coordinated lift booking.

    - WoodAge in-house install team for both kitchen and wardrobes.

    - Soft-close calibration and handover walkthrough per cabinet.

    - Direct-to-manufacturer warranty on carcass, shutters, and factory-installed hardware.

  

  
## 2BHK scope example: illustrative scope for a typical Gurgaon 2BHK

  
| Component | Typical scope | Notes |
| --- | --- | --- |
| Kitchen layout | L-shape or compact parallel | Typical 8-12 running foot total |
| Kitchen carcass | BWP IS:710 in sink/dishwasher base; HDHMR elsewhere | NCR-humidity rationale |
| Kitchen shutters | Laminate or acrylic per buyer preference | Hettich Sensys hinges, Hettich drawer system |
| Master bedroom wardrobe | Sliding or hinged, 7-8 feet wide × 8 feet tall | BWP carcass + laminate/acrylic shutter |
| Second bedroom wardrobe | Hinged, 6 feet wide × 7 feet tall | Similar finish |
| Lead time | 4-6 weeks from BOQ sign-off | Faster than 3BHK due to smaller scope |
| Install window | 4-7 working days | Kitchen first 2 days; wardrobes next 2-4 |

  
## 3BHK scope example: illustrative

  
| Component | Typical scope | Notes |
| --- | --- | --- |
| Kitchen layout | L-shape with island OR U-shape | Typical 12-18 running foot total |
| Pantry tall unit | One 600 mm × 2400 mm tall unit | Häfele pantry pull-out |
| Master bedroom wardrobe | Sliding 9-10 feet wide | Walk-in option if dressing-area exists |
| Second bedroom wardrobe | Hinged 7-8 feet wide | - |
| Third bedroom wardrobe | Hinged 6-7 feet wide | - |
| Hardware tier upgrade | Blum Tandembox option on master bedroom drawers | Premium tier |
| Lead time | 5-7 weeks from BOQ sign-off | Parallel kitchen + wardrobe manufacture |
| Install window | 7-10 working days | Kitchen days 1-3; wardrobes 4-10 |

  
## 4BHK scope example: illustrative

  
| Component | Typical scope | Notes |
| --- | --- | --- |
| Kitchen layout | Island or U-shape with separate utility area | 15-22 running foot |
| Pantry + utility cabinets | Tall pantry unit + utility storage | Häfele pantry, Blum lift-up on overhead utility |
| Master bedroom walk-in | Walk-in closet, 80-120 sq ft | Drawer towers + hanging zones + shoe storage |
| Second bedroom wardrobe | Sliding 8-9 feet wide | - |
| Third bedroom wardrobe | Hinged 7 feet wide | - |
| Fourth bedroom / study wardrobe | Hinged 6 feet wide | Or built-in study desk integration |
| Hardware tier | Blum Tandembox + AVENTOS standard at this tier | - |
| Lead time | 6-8 weeks from BOQ sign-off | Larger scope; same parallel-manufacture approach |
| Install window | 10-14 working days | Kitchen first, then bedrooms sequentially |

  
## Package-tier cost reference: 2026 market ranges by apartment + tier

  
The ranges below are a third-party market reference for full interior packages in Gurgaon in 2026, useful for budgeting before a measured quote. A kitchen + wardrobe bundle is usually a subset of a full-home package, so it typically sits at or below these figures depending on whether living-room, beds and false ceiling are included. WoodAge does not sell fixed-price tiers - the per-line BOQ is confirmed only after site measurement.

  
| Apartment | Tier | Market range (2026) |
| --- | --- | --- |
| 2BHK | Basic | ₹5-7 lakh |
| 2BHK | Mid | ₹7-10 lakh |
| 2BHK | Premium | ₹10-14 lakh |
| 2BHK | Luxury (full interiors) | ₹20-28 lakh |
| 3BHK | Standard to premium | ₹12-20 lakh+ |
| 3BHK | Luxury (full interiors) | ₹35-60 lakh+ |

  
Third-party market estimate as of 2026 (sources: riseandtread.com, designcafe.com, livspace.com); not a WoodAge quote - confirmed only after site measurement and a written per-line BOQ. GST (18%) shown as a separate line. These are full-package ranges; a kitchen + wardrobe bundle scope is itemised separately on the WoodAge BOQ, and WoodAge does not advertise a guaranteed bundle discount.

  
## Inclusions vs exclusions matrix

  
| Item | Included in WoodAge bundle | Excluded / scoped separately |
| --- | --- | --- |
| Kitchen cabinet manufacture + install | ✅ | - |
| All wardrobes (sliding / hinged / walk-in) | ✅ | - |
| Site measurement + GA drawings + BOQ | ✅ (design fee disclosed) | - |
| Material (BWP / HDHMR / laminate / acrylic / hardware) | ✅ | - |
| Edge banding (machine) | ✅ | - |
| Factory dispatch + transport + lift booking | ✅ (charged as line) | - |
| In-house install team | ✅ | - |
| Countertop slab + cutting | Coordinated | Slab supplier sometimes independent |
| Chimney + hob + appliances | Coordinated; quoted separately | Often buyer-procured |
| Sink + tap | Coordinated; quoted separately | Often buyer-procured |
| Gas line + core-cutting | Coordinated | Per society approval |
| Electrical re-routing | Coordinated | Separate electrician |
| Civil masonry, tile, flooring, false ceiling | - | ❌ Not in scope |
| Paint, lighting, curtain rods | - | ❌ |
| Beds, sofas, dining tables, other furniture | - | ❌ (separate WoodAge custom-furniture scope) |
| NOC + RWA coordination | Templates + guidance | Buyer signs society paperwork |

  
## New-possession-flat checklist: 12 things to verify before kitchen + wardrobe install

  

    - **Builder handover paperwork received** - registry, occupancy certificate, possession letter.

    - **Society NOC for interior work obtained** - typically 3-10 working days turnaround.

    - **Lift access slot booked** with the society office.

    - **Electricity meter live** in the apartment - no install on a powered-down site.

    - **Water connection live** - needed for plumbing tests and dado tile work.

    - **Gas line installed and pressure-tested** - before kitchen cabinet install.

    - **Tile / flooring complete** - install on un-tiled floor risks scratching shutters.

    - **Dado tile in kitchen complete** (or scope confirmed) - to avoid shutter removal mid-install.

    - **Plumbing points exactly per GA drawing** - verify before manufacture, not after.

    - **Electrical points at correct heights** per GA drawing.

    - **False ceiling complete** above kitchen if planned.

    - **No active civil work** - dust risks new shutters and finishes.

  

  
## Cost drivers: what shifts a kitchen + wardrobe bundle price

  
The bundle BOQ varies on the same dimensions as individual kitchen and wardrobe pricing:

  

    - **Apartment size and wardrobe count** - 2BHK vs 3BHK vs 4BHK changes total running foot.

    - **Finish tier across kitchen + wardrobes** - laminate, acrylic, PU, lacquer glass, or veneer per shutter.

    - **Hardware tier** - basic hinges vs Hettich Sensys vs Blum Tandembox + AVENTOS.

    - **Walk-in closet vs hinged wardrobe** - walk-ins add drawer towers + hanging zones + shoe storage.

    - **Accessory volume** - pantry pull-outs, magic corners, tandem boxes, integrated bins, lift-up systems.

    - **Material continuity** - same laminate across kitchen and wardrobes (small saving) vs distinct finishes (no continuity penalty).

    - **Society logistics** - tighter lift slots / NOC delays add install days.

  

  
For per-running-foot ranges, see the [WoodAge modular kitchen cost guide for Gurgaon](/modular-kitchen-cost-gurgaon/).

  
## WoodAge bundle process: 9 steps from site visit to handover

  

    - **Discovery + site measurement.** Kitchen and every wardrobe measured in one visit. Plumbing, electrical, gas, ceiling height recorded.

    - **GA drawings for kitchen and wardrobes.** Shared for buyer sign-off before BOQ.

    - **Single bundle BOQ.** Line-by-line - every cabinet, every shutter, every hinge, every drawer system.

    - **Advance + BOQ sign-off.** Typically 10-15% advance on BOQ approval.

    - **Material procurement + factory cutting.** Kitchen and wardrobes cut in parallel at WoodAge Gurugram factory.

    - **Factory dispatch + lift booking.** All cabinets transported in one slot when possible.

    - **Kitchen install first.** Days 1-3 of install - needs gas + electrical readiness.

    - **Wardrobes install sequentially.** Days 4-10 - master bedroom first, then others.

    - **Handover walkthrough + soft-close calibration.** Every cabinet checked; soft-close timing adjusted per drawer.

  

  
## Why a bundle is operationally cleaner than separate scopes

  
Buying kitchen and wardrobes separately means: two site measurements, two BOQs, two factory dispatch windows, two lift bookings, two install crews, and two warranty channels. A WoodAge bundle consolidates all of these - one measurement visit, one BOQ document, one factory dispatch, one lift booking, one install team, one warranty channel. The buyer's coordination overhead drops meaningfully; the project cost reflects the operational efficiency.

  
## FAQs about kitchen + wardrobe packages in Gurgaon

  What does a WoodAge kitchen + wardrobe package for a Gurgaon apartment include?
  
A WoodAge bundle package covers: full modular kitchen manufacture and install (carcass + shutters + hardware + accessories), wardrobes for every bedroom (sliding / hinged / walk-in per room), site measurement, GA drawings, factory cutting in Gurugram, transport, lift booking coordination, and on-site installation. Civil work, electrical re-routing, gas line, dado tile, false ceiling, and appliance procurement are scoped separately as transparent BOQ lines.

  Is a bundled kitchen + wardrobe package actually cheaper than buying them separately?
  
A bundle can be more cost-efficient because design overhead and install logistics (single site visit, single lift booking, single delivery window) are amortised across the larger scope. Material consolidation (same laminate brand across kitchen and wardrobes) also reduces small-lot pricing inefficiency. The exact saving depends on apartment size, scope, finish tier, and accessory volume - WoodAge presents the bundle BOQ alongside an unbundled comparison so the buyer sees the delta. We do not claim a guaranteed bundle discount.

  What is the typical timeline for a 3BHK kitchen + wardrobe package?
  
A typical 3BHK kitchen + wardrobe bundle takes 5-7 weeks from BOQ sign-off to handover: 1 week for site measurement and GA drawing iteration, 2-3 weeks of parallel factory manufacturing (kitchen and wardrobes built in parallel, not sequentially), 1 week for dispatch and lift coordination, and 1-2 weeks for sequential install (kitchen first because it depends on gas and electrical readiness, then wardrobes room by room). Estimates only - depends on civil readiness, society NOC turnaround, and accessory complexity.

  When should I order a kitchen + wardrobe package for a new-possession Gurgaon flat?
  
Ideally start the conversation 6-8 weeks before builder handover, even before keys. WoodAge can plan from the floor plan, schedule the site measurement for immediately after possession, and queue factory manufacture against the GA drawing. This compresses the total move-in timeline by 2-4 weeks vs starting after possession. If the builder handover slips, the site measurement waits - but design and material procurement progresses.

  What 12 things should be checked on a new-possession Gurgaon flat before kitchen + wardrobe install?
  
(1) Builder handover paperwork received, (2) Society NOC for interior work obtained, (3) Lift access slot booked, (4) Electricity meter live in the apartment, (5) Water connection live, (6) Gas line installed and pressure-tested, (7) Tile / flooring complete, (8) Dado tile in kitchen complete (or scope confirmed), (9) Plumbing points exactly per GA drawing, (10) Electrical points at correct heights per GA drawing, (11) False ceiling complete above kitchen if planned, (12) No active civil work - dust risks new shutters.

  Should kitchen install happen before or after wardrobe install?
  
Kitchen install almost always happens first because it depends on gas line readiness, electrical points, dado tile (if in scope), and a non-dusty environment for shutter polish. Wardrobes can be installed in parallel sequentially by room - typically the master bedroom wardrobe first (the largest), then children's and guest. WoodAge schedules kitchen days 1-3 and wardrobe install days 4-10 for a typical 3BHK bundle.

  Are appliances (chimney, hob, oven, microwave, dishwasher) included in the WoodAge bundle?
  
Appliances are typically scoped separately. WoodAge can coordinate procurement (with buyer-confirmed brand selection) and include them in the bundle BOQ as a separate line, OR the buyer procures directly. Cabinet cut-outs, ventilation routing, and electrical points are designed against the chosen appliance dimensions - so appliance selection should happen before GA drawing sign-off. The 'Built-in Kitchen Appliance' buying guide on the WoodAge blog covers this scope in depth.

  Can wardrobes use a different shutter finish from the kitchen in the same bundle?
  
Yes. WoodAge bundles allow material continuity (same laminate brand and finish across kitchen and wardrobes for a visually unified apartment) OR distinct per-room finishes (a glossy acrylic kitchen with veneer wardrobes in the master bedroom, for example). Material continuity reduces small-lot pricing inefficiency slightly but is not required - the bundle still saves on design and install logistics regardless of finish strategy.

  What is excluded from a typical WoodAge kitchen + wardrobe package?
  
Typically out-of-scope: civil masonry work, structural alterations, electrical panel upgrades, plumbing main-line work, tile and flooring, false ceiling (unless explicitly added), paint, lighting fixtures, curtain rods, beds and bedroom furniture other than wardrobes, sofas / living-room furniture, dining tables. WoodAge does separately offer custom furniture manufacturing (beds, sofas, dining) - those become distinct BOQ lines on a turnkey interiors scope, not a kitchen + wardrobe bundle.

  Does WoodAge coordinate society NOC and lift booking for the install?
  
Yes. WoodAge shares standard NOC templates the buyer signs with the RWA, coordinates the lift-booking slot with the society office, manages gate-pass arrangement, and ensures install crews comply with society working-hours and refundable damage deposit policies. Most large Gurgaon societies (Dwarka Expressway, Golf Course Road, Golf Course Extension Road, New Gurgaon) have NOC turnaround of 3-10 working days.

  
## Related WoodAge pages

  

    - [Modular Kitchen Manufacturer in Gurgaon](/modular-kitchen-manufacturer-gurgaon/)

    - [Factory-Direct Modular Kitchen in Gurgaon](/factory-direct-modular-kitchen-gurgaon/)

    - [Modular Kitchen Cost in Gurgaon (2026)](/modular-kitchen-cost-gurgaon/)

    - [Livspace Alternative in Gurgaon](/livspace-alternative-gurgaon/)

    - [HomeLane Alternative in Gurgaon](/homelane-alternative-gurgaon/)

    - [Complete home interior planning checklist for Gurgaon](/blogs/posts/2026/complete-home-interior-planning-checklist-gurgaon-2026/)

    - [High-rise install - NOC, lift, drilling rules](/blogs/posts/2026/high-rise-modular-kitchen-installation-gurgaon-noc-rules/)

    - [Built-in appliance cost & integration guide](/blogs/posts/2026/built-in-kitchen-appliances-cost-integration-gurgaon-2026/)

  

  
**WoodAge**, Saraswati Vihar, Gurugram - factory-direct manufacturer since 2003.

  
Not affiliated with woodagesofacumbed. All ranges and timelines on this page are estimates only - final BOQ depends on site measurement, finish tier, hardware, accessories, and site readiness.

  
Last updated: 8 June 2026 - by WoodAge.

  
  
    &times;
    
Factory-Direct Consultation

    
## Get a Transparent BOQ Quote

    
Share your requirement and the WoodAge team will respond with the right next step. Every estimate is confirmed only after a site measurement and a written BOQ.

    
      
      
      
      Name *
      
      Email *
      
      Phone Number *
      
      What do you need? *
      
      Request Quote
      
We use these details only to respond to your enquiry. No spam.