Kitchen + Wardrobe Package for Gurgaon Apartments: Scope, Cost, Timeline (2026)

WoodAge offers a combined kitchen plus wardrobe package for Gurgaon apartments, with manufacturing at its Gurugram factory since 2003. The agreed scope can include site measurement, GA drawings, a line-by-line BOQ, transport or access arrangements where listed, and installation. Final scope, dates and price follow measurement, material selection, building readiness and the written BOQ. Call +91-9910318044.

Caveat: bundle pricing is project-specific

Any range or timeline on this page is for planning only. The final BOQ depends on the measured layout, agreed finish and hardware, accessory volume, civil readiness, building-access requirements and design scope. WoodAge confirms the applicable scope, dates and amount only in a written BOQ; this page does not promise a fixed price or delivery date.

Kitchen + wardrobe interface and BOQ checklist

A combined package is decision-ready only when the kitchen and wardrobe scopes share the same site assumptions. Check these interfaces before approving drawings or a sequence:

  1. One measured base: record room, wall, ceiling, plumbing, electrical, gas, appliance and lift/access dimensions once, with a drawing revision.
  2. Zone-specific materials: name the board/plywood product and grade, finish and exposed-edge treatment for kitchen and wardrobe zones; do not copy one material across different exposure conditions.
  3. Exact hardware: list hinge, drawer, lift, sliding-track and accessory brand plus line/SKU for each relevant cabinet, with a written substitution route. Manufacturer references such as Hettich's hinge range and Blum's CLIP top overview can help identify a line; they do not prove WoodAge stock or partnership.
  4. Combined BOQ boundaries: separate cabinets, wardrobes, countertop, appliances, civil/electrical/plumbing, transport, approvals, installation, GST and exclusions.
  5. Sequence and route: state the readiness gate, dispatch/packing, lift or society booking, kitchen-versus-wardrobe install order, snag owner and handover record.

For plywood terminology, compare the selected product with the current BIS IS 303:2024 or BIS IS 710:2024 reference as applicable. The standards inform product checks; they do not make a package price, timeline or installed-performance promise.

WoodAge bundle scope: what's included

The following are scope items to discuss for a WoodAge kitchen + wardrobe package in Gurgaon. Each item is included only when the written BOQ says so:

2BHK scope example: illustrative scope for a typical Gurgaon 2BHK

ComponentTypical scopeNotes
Kitchen layoutL-shape or compact parallel, subject to measurementConfirm wall lengths and services in the GA drawing
Kitchen carcassBWP IS:710 in sink/dishwasher base; HDHMR elsewhereNCR-humidity rationale
Kitchen shuttersLaminate or acrylic per buyer preferenceHettich Sensys hinges, Hettich drawer system
Master bedroom wardrobeSliding or hinged, dimensions after measurementCarcass and shutter finish selected in the BOQ
Second bedroom wardrobeHinged or sliding, dimensions after measurementFinish and internals confirmed in the BOQ
Lead timeProject schedule after BOQ sign-offDepends on scope, materials and site readiness
Install windowWritten installation planSequence depends on access and agreed scope

3BHK scope example: illustrative

ComponentTypical scopeNotes
Kitchen layoutL-shape, island or U-shape, subject to measurementConfirm services, clearances and wall lengths in the GA drawing
Pantry tall unitOptional tall unit if included in the measured scopeAccessory and hardware line specified separately
Master bedroom wardrobeSliding, hinged or walk-in where the measured plan supports itDimensions and internal layout confirmed in the BOQ
Second bedroom wardrobeHinged or sliding, dimensions after measurementFinish and internals confirmed in the BOQ
Third bedroom wardrobeHinged or sliding, dimensions after measurementFinish and internals confirmed in the BOQ
Hardware tier upgradeBlum Tandembox option on master bedroom drawersPremium tier
Lead timeProject schedule after BOQ sign-offDepends on scope, materials and site readiness
Install windowWritten installation planSequence depends on access and agreed scope

4BHK scope example: illustrative

ComponentTypical scopeNotes
Kitchen layoutIsland or U-shape where the measured plan supports itConfirm utility services and wall lengths in the GA drawing
Pantry + utility cabinetsTall pantry unit + utility storageHäfele pantry, Blum lift-up on overhead utility
Master bedroom storageWalk-in or wardrobe layout if supported by the measured planDrawer towers, hanging zones and shoe storage are optional lines
Second bedroom wardrobeSliding or hinged, dimensions after measurementConfirm finish and internals in the BOQ
Third bedroom wardrobeSliding or hinged, dimensions after measurementConfirm finish and internals in the BOQ
Fourth bedroom / study wardrobeWardrobe or study integration if includedConfirm dimensions and joinery in the BOQ
Hardware tierBlum Tandembox + AVENTOS standard at this tier-
Lead timeProject schedule after BOQ sign-offLarger scope may require additional coordination; confirm in writing
Install windowWritten installation planSequence depends on access and agreed scope

Package-tier cost reference: 2026 market ranges by apartment + tier

No fixed market band on this page should be treated as a current WoodAge price. Published package figures vary by source, date, scope and inclusions, so a buyer should use a measured, itemised BOQ rather than infer a bundle amount from an apartment label or tier.

The table below records what large national interior firms published for Delhi NCR and Gurgaon in 2026, reproduced with the scope each publisher stated. These are third-party estimates for orientation before a measured quote, not WoodAge prices and not offers.

Published 2026 third-party market references, Delhi NCR and Gurgaon (accessed 23 August 2026)
Published referenceScope as publishedFigure as published
HomeLane, Modular Kitchen Cost in Gurgaon (2026 estimate)Modular kitchen, rate per sq ft₹2,200 to ₹4,500+ per sq ft
HomeLane, same guideApartment kitchen — cabinets, shutters, delivery and fitting; civil work excluded₹2 lakh to ₹5 lakh; premium homes from ₹6 lakh
Livspace, Home Interior Design Cost in Delhi (figures dated February 2026)Modular line item (kitchen plus wardrobes), 2BHK and aboveEssential ₹3.35 lakh · Premium ₹3.92 lakh · Luxury ₹6.51 lakh
Livspace, same guideWhole-home interiors, 2BHK of 1,000–1,200 sq ft; dado tiling, painting and appliances excludedEssential from ₹9.70 lakh · Premium from ₹20.58 lakh
Livspace, same guideWhole-home interiors, 3BHK of 1,500–1,700 sq ft; same exclusionsEssential from ₹17.76 lakh · Premium from ₹29.38 lakh
Livspace, How Much Does a Wardrobe Cost (2026 update)Wardrobe by type, starting pricesHinged two-door from ₹53,000 · Sliding from ₹1.10 lakh · Walk-in (9×7 ft) from ₹1.25 lakh

Read the table as a band, not a benchmark. A kitchen-plus-wardrobe bundle sits between the single-scope kitchen figures and the whole-home figures, because it carries the kitchen and the bedroom storage but not flooring, false ceiling, painting, loose furniture or appliances. Two published figures are only comparable when the exclusions match, which is why the checklist below asks for scope line by line. WoodAge's own workings are set out in its modular kitchen cost guide, wardrobe cost guide and full-home interior cost guide.

Scope areaAsk forWhy it matters
Kitchen cabinetsMeasured lengths, layout, carcass, shutters, hardware and accessoriesPrevents a bundle label from hiding cabinet-level scope
Wardrobes and storageRoom-by-room dimensions, internals, shutters and finishStorage count and configuration change the amount
Site and access workTransport, installation, building approvals and any coordination linesThese items are not universal inclusions
Taxes and exclusionsGST, appliances, countertop, civil, electrical and plumbing treatmentSeparates comparable totals from incomplete quotes

Use current primary documents and a written, measured BOQ for a real decision. WoodAge does not publish a guaranteed package price or guaranteed bundle discount on this page.

Inclusions vs exclusions matrix

The matrix below is a checklist for separating included, coordinated and excluded items. The written BOQ controls the actual scope.

ItemIncluded in WoodAge bundleExcluded / scoped separately
Kitchen cabinet manufacture + install-
Wardrobes in the agreed scope (sliding / hinged / walk-in where planned)As written in BOQRoom count and configuration to be confirmed
Site measurement + GA drawings + BOQ✅ (design fee disclosed)-
Material (BWP / HDHMR / laminate / acrylic / hardware)-
Edge treatmentAs specifiedConfirm method and affected components
Factory dispatch + transport + access arrangementsAs written in BOQBuilding or society approvals may remain with the buyer
InstallationAs written in BOQConfirm responsible team and handover scope
Countertop slab + cuttingCoordinatedSlab supplier sometimes independent
Chimney + hob + appliancesAs written in BOQConfirm supplier, model, cut-outs and responsibility
Sink + tapAs written in BOQConfirm supplier and responsibility
Gas line + core-cuttingCoordinatedPer society approval
Electrical re-routingCoordinatedSeparate electrician
Civil masonry, tile, flooring, false ceilingAs written in BOQConfirm whether added, coordinated or separate
Paint, lighting, curtain rodsAs written in BOQConfirm whether included or separately sourced
Beds, sofas, dining tables, other furnitureAs written in BOQConfirm whether separate WoodAge furniture scope applies
Society or building approvalsInformation or templates where agreedBuyer remains responsible for approvals unless the BOQ states otherwise

New-possession-flat checklist: 12 things to verify before kitchen + wardrobe install

  1. Builder handover paperwork received - registry, occupancy certificate, possession letter.
  2. Building or society approval requirements checked and responsibility recorded.
  3. Access arrangements confirmed with the building or society office where required.
  4. Electricity meter live in the apartment - no install on a powered-down site.
  5. Water connection live - needed for plumbing tests and dado tile work.
  6. Gas line installed and pressure-tested - before kitchen cabinet install.
  7. Tile / flooring complete - install on un-tiled floor risks scratching shutters.
  8. Dado tile in kitchen complete (or scope confirmed) - to avoid shutter removal mid-install.
  9. Plumbing points exactly per GA drawing - verify before manufacture, not after.
  10. Electrical points at correct heights per GA drawing.
  11. False ceiling complete above kitchen if planned.
  12. No active civil work - dust risks new shutters and finishes.

Cost drivers: what shifts a kitchen + wardrobe bundle price

The bundle BOQ varies on the same dimensions as individual kitchen and wardrobe pricing:

For per-running-foot ranges, see the WoodAge modular kitchen cost guide for Gurgaon.

WoodAge bundle process: 9 steps from site visit to handover

  1. Discovery + site measurement. The agreed kitchen and wardrobe areas are measured; relevant plumbing, electrical, gas and ceiling details are recorded.
  2. GA drawings for kitchen and wardrobes. Shared for buyer sign-off before BOQ.
  3. Bundle BOQ. The agreed cabinets, shutters, hinges, drawer systems, accessories and exclusions are itemised.
  4. Advance + BOQ sign-off. Any advance and payment milestones are stated in the written BOQ.
  5. Material procurement + factory cutting. The agreed kitchen and wardrobe scope is prepared at WoodAge's Gurugram factory according to the plan.
  6. Factory dispatch + access arrangements. Transport and building access are handled only as stated in the BOQ.
  7. Installation sequence. Kitchen and wardrobe work is sequenced around readiness, access and the agreed scope.
  8. Handover walkthrough. The agreed items are checked and any documented adjustments are recorded.

Why a bundle is operationally cleaner than separate scopes

Buying kitchen and wardrobes separately can involve separate site measurements, BOQs, factory dispatch windows, lift bookings, installation coordination and warranty contacts, depending on the vendors and scope. A WoodAge bundle may consolidate some or all of those touchpoints into one coordinated BOQ, dispatch plan, lift arrangement, installation team or warranty contact; confirm each responsibility and exception in writing. The buyer's coordination overhead and project cost depend on the final scope and BOQ.

Plan a kitchen + wardrobe package

A kitchen-and-wardrobe package is easier to evaluate when the scope remains visible: compare the kitchen and storage requirements, inclusions, exclusions, site readiness and combined installation sequence before choosing one BOQ or separate scopes.

Decision questionPractical guidance
kitchen wardrobe package GurgaonUse one BOQ when kitchen and bedroom storage need coordinated finish, sequence and measurement.
2BHK kitchen wardrobe packageConfirm kitchen length, bedroom count, lofts, finish tier and whether countertop or appliances are included.
3BHK kitchen wardrobe packageCheck the number of wardrobes, kitchen layout, accessory count, finish tier and site readiness.
new possession flat woodwork packageStart early enough for drawings, measurement, approvals and a written BOQ before installation.
package inclusions exclusionsSeparate cabinets, wardrobes, countertop, appliances, civil, electrical, transport, GST and installation.
bundle vs separate vendorsA bundle helps scheduling only when every line item remains visible in the BOQ.

For Dwarka Expressway and Golf Course Extension Road possession buyers, share the handover date, tower access rules, room count and any helpful floor-plan or site information. WoodAge can then discuss whether a combined package or separate scopes are clearer for the measured requirements.

FAQs about kitchen + wardrobe packages in Gurgaon

What does a WoodAge kitchen + wardrobe package for a Gurgaon apartment include?

A WoodAge kitchen + wardrobe package can cover the agreed kitchen and storage scope, site measurement, GA drawings, factory manufacture, transport and installation where those lines are included in the written BOQ. Carcass, shutters, hardware, accessories, civil work, electrical re-routing, gas line, dado tile, false ceiling and appliance procurement should be listed as included, excluded or separately coordinated items.

Is a bundled kitchen + wardrobe package actually cheaper than buying them separately?

A bundle is not automatically cheaper than separate scopes. Compare matched written BOQs line by line: measured dimensions, materials, hardware, accessories, transport, installation, GST and exclusions. Any price difference depends on the agreed scope, finish, hardware, site conditions and current material availability; WoodAge confirms the applicable amount only in the written BOQ.

What is the typical timeline for a 3BHK kitchen + wardrobe package?

There is no single reliable timeline for a 3BHK kitchen + wardrobe package. WoodAge confirms the project schedule after measurement, GA-drawing and BOQ sign-off, taking account of the agreed scope, material availability, accessory complexity, civil readiness and building access requirements. The written plan should identify manufacture, dispatch, installation and handover milestones.

When should I order a kitchen + wardrobe package for a new-possession Gurgaon flat?

Start the conversation early enough to allow the floor plan, site measurement, GA drawings, written BOQ and building-access approvals to be reviewed before installation. WoodAge can discuss a provisional plan from the floor plan, but manufacture and final scheduling should follow measurement, approval and the written scope. If handover changes, the plan must be revised rather than promising a fixed move-in saving.

What 12 things should be checked on a new-possession Gurgaon flat before kitchen + wardrobe install?

(1) Builder handover paperwork received, (2) building or society approval requirements checked, (3) access arrangements confirmed, (4) electricity available where required, (5) water available where required, (6) gas scope and testing responsibility confirmed, (7) tile / flooring status checked, (8) dado tile scope confirmed, (9) plumbing points checked against the GA drawing, (10) electrical points checked against the GA drawing, (11) false-ceiling scope confirmed, (12) active civil work and protection requirements recorded.

Should kitchen install happen before or after wardrobe install?

There is no universal sequence for a kitchen and wardrobe package. Ask the project plan to record the dependencies that apply to the measured site: services, dado or other in-scope work, surface protection, access and readiness. Kitchen and wardrobes may be installed in parallel or in an agreed order; the written plan, not an apartment label or generic assumption, controls dates.

Are appliances (chimney, hob, oven, microwave, dishwasher) included in the WoodAge bundle?

Do not assume that a chimney, hob, oven, microwave or dishwasher is included or excluded. Ask the BOQ to mark each appliance as WoodAge-supplied, buyer-supplied, coordinated or excluded, and confirm brand or model dimensions before GA-drawing sign-off. Confirm cut-outs, ventilation, electrical points, installation and warranty responsibility in writing. The linked appliance guide can provide questions, but the current BOQ controls.

Can wardrobes use a different shutter finish from the kitchen in the same bundle?

Yes. The kitchen and wardrobes can use the same or different shutter finishes when the selected materials and measured scope allow it. The written BOQ should show the finish, hardware, dimensions and price for each agreed area; a shared finish is a design choice, not a promised saving.

What is excluded from a typical WoodAge kitchen + wardrobe package?

There is no universal exclusion list for a WoodAge kitchen + wardrobe package. Ask the BOQ to mark each item—civil or structural work, electrical or plumbing changes, tiles or flooring, false ceiling, paint or lighting, window treatments, other furniture, appliances, transport, access and installation—as included, separately coordinated or excluded. The written scope controls; beds, sofas or dining can be separate BOQ lines when expressly agreed.

Does WoodAge coordinate society NOC and lift booking for the install?

Building and society requirements vary. The buyer should confirm approvals, access slots, gate procedures, working hours and any deposits with the society office. WoodAge can provide scope or measurement information and handle any agreed coordination line, but the written BOQ should identify who is responsible for each approval and arrangement.

WoodAge, Saraswati Vihar, Gurugram - factory-direct manufacturer since 2003.

Not affiliated with woodagesofacumbed. All ranges and timelines on this page are estimates only - final BOQ depends on site measurement, finish tier, hardware, accessories, and site readiness.

- by WoodAge.