WoodAge Case Studies

WoodAge publishes a customer project record only after its scope, consent, privacy status and supporting proof assets are verified for public use. This collection contains 4 owner-attested completed project records; client identities remain redacted and each page states its scope, sources and evidence boundary.

Published project records

Each card below is built from the owner-attested manifest and the matching public case body. Visual assets are labelled as design visualizations; scope, materials, timing and snag closure remain record-specific.

Design visualization of the L-shaped modular kitchen layout described for the Dwarka Expressway 3BHK
Design visualization. L-shaped kitchen visualization showing the measured corner, tall-unit zone and continuous worktop.

Verified live · owner-attested record

3BHK Dwarka Expressway: Kitchen + 3 Wardrobes Case Study

Project and locality
3BHK apartment, ~1,750 sq ft carpet, new possession · Dwarka Expressway corridor, Sector 108, Gurugram
Recorded scope
L-shaped modular kitchen + 3 wardrobes (1 sliding, 2 hinged)
Material
IS:710 BWP 18 mm in wet zone; IS:303 BWR 18 mm dry zone
Hardware / execution detail
Hettich Sensys concealed hinges (80,000-cycle rating); soft-close tandem drawer systems
Timeline
31 days, site measurement to snag closure
Outcome boundary
4 items, all closed within 6 days. This is an owner-attested record with client identity redacted; it does not establish a universal price, duration or performance result.

Read the verified project record

Design visualization of a dust-controlled modular kitchen replacement in an occupied Sohna Road apartment
Design visualization. Renovation-process visualization showing a protected route, retained counter and factory-finished cabinet installation in an occupied flat.

Verified live · owner-attested record

2BHK Sohna Road: Kitchen Renovation in an Occupied Flat

Project and locality
2BHK apartment, ~1,150 sq ft carpet, occupied throughout · Sohna Road corridor, Sector 48, Gurugram
Recorded scope
Full cabinetry replacement; existing counter, tiling and plumbing retained
Material
IS:710 BWP 18 mm throughout, on account of the retained 9-year-old plumbing
Hardware / execution detail
Not recorded in the public project record.
Timeline
24 days, site measurement to snag closure
Outcome boundary
3 items, all closed within 4 days. This is an owner-attested record with client identity redacted; it does not establish a universal price, duration or performance result.

Read the verified project record

Design visualization of an island kitchen with one sink and one induction hob in a Gurugram builder floor
Design visualization. Island-kitchen visualization showing the single sink, induction zone and staircase access constraint.

Verified live · owner-attested record

4BHK Builder Floor Turnkey: Island Kitchen + Walk-In Wardrobe

Project and locality
4BHK independent builder floor, ~2,400 sq ft, third floor, no service lift · Golf Course Extension Road corridor, Sector 65, Gurugram
Recorded scope
Turnkey: island kitchen, walk-in wardrobe, 3 bedroom wardrobes, TV unit, crockery unit
Material
IS:710 BWP 18 mm wet zone and full island; IS:303 BWR 18 mm elsewhere
Hardware / execution detail
Open-frame modular system, 11 running feet across three walls
Timeline
47 days, site measurement to snag closure
Outcome boundary
6 raised, all closed within 9 days. This is an owner-attested record with client identity redacted; it does not establish a universal price, duration or performance result.

Read the verified project record

Design visualization of a back-to-back workstation layout for the Udyog Vihar office.
Design visualization. Conceptual office-floor visualization of back-to-back workstation modules and a shared central spine.

Verified live · owner-attested record

50-Seat Office Fit-Out, Udyog Vihar: Workstation Case Study

Project and locality
50-seat office fit-out · Udyog Vihar, Gurugram
Recorded scope
50 linear workstations, 4 cabins, 1 boardroom table, storage and reception
Material
25 mm prelaminated board, 2 mm PVC edge banding on all exposed edges
Hardware / execution detail
Continuous spine raceway with per-seat drop and flip-top access
Timeline
38 days, order confirmation to snag closure
Outcome boundary
5 raised, all closed within 7 days. This is an owner-attested record with client identity redacted; it does not establish a universal price, duration or performance result.

Read the verified project record

What WoodAge verifies before publication

Minimum evidence for a public project record
Evidence areaPublication requirement
Project recordA traceable first-party record with scope, materials, timing and outcome boundaries.
Consent and privacyA documented permission reference and an approved public privacy treatment.
Proof assetsRegistered project assets whose permission status supports public use.
Claim provenanceEach visible project claim is mapped to the supporting project record.
Public representationVisible text, metadata and structured data describe only verified information.

What a published record includes

A public record explains the verified scope, decision context, materials, installation boundaries and documented results. It identifies any anonymisation or exclusions needed to respect customer privacy.

Plan a project with verifiable documents

For a current project, request a line-by-line BOQ and discuss the documents that define scope, material selection, exclusions and installation planning. Those documents are more useful for a buying decision than an unsupported example.

Request a line-by-line BOQ · Book a factory visit